BCIT-VCC, Motive Power Centre of Excellence, Delta

This $20 million facility improvement project consisted of two storey structure spanning across existing buildings A, B, C & D with total floor area of 141,803-sq.ft. The existing, non-purpose built warehouse structures had to be renovated to host heavy mechanical trades (Heavy Duty/Commercial Transport/Diesel Engine); Railway Conductor and Warehouse Equipment Operator programs. Sanjay’s role was to lead the representatives of BCIT and VCC, Consultants and General Contractor. He was responsible for scope, cost and schedule control, liaising with the building owner, preparation of weekly and monthly progress reports. Sanjay started working in the middle of this fast track project which instead of being a challenge brought in a fresh perspective of value engineering and schedule control. Sanjay was able to manage the scope expectations of various stakeholders from two institutions while maintaining the delivery of project under budget.